Bolt-On Jacketing 
  Technology
  ControHeat

  How It Works

  Examples on Valves

  Examples on Pumps

  Example on Instruments

  ControHeat Selector

      Process Applications
      Installation Instructions
      FAQ
  ControTrace 

  How It works

  Examples on Pipe

  Examples on Tanks

      Process Applications
      Basic Installation Instructions
      Detailed Installation Instructions
  Heat Transfer Cement 

 
Fabricated Products and 
  Systems
  Jacketed pipe

  Standard

  Swaged

  Insert Flanged

  Hybrid

  High- Pressure

  Examples: Jacketed Pipe

  Fabricated Jacketed Valves

  Four Different Types

  Examples: Jacketed Valves

  Flexible Metal Hoses

  Jumpover Hose

  Jacketed Loading Hoses

  Compensator Hoses

  Precision Manifolds

 
Engineering Services

 

 

ControHeat Installation Instructions

1- Install component and check for proper fit of ControHeat.

2- Coat Inner surface of jacket with a thin layer of heat transfer cement  CSI Grade 1.

3- Tighten Bolts: remove excess heat transfer cement.


More detailed instructions


The format of this Electronic Document is Adobe Acrobat PDF file. If the file does not load after clicking on the icon, you will need to download and install Adobe Acrobat Reader directly from Adobe Systems corporation. There is no charge for the installation of Adobe Acrobat Reader and you will find it helpful in viewing objects from other websites.


Please Click here to go to
Adobe's Acrobat Reader website.